enreta™ 1.5m 2m 3m 5m 10 Meter HDMI Cable HIGH SPEED Long Lead with Ethernet ARC Full HD 1080p PS4 Xbox One Sky HD TV Black & Gold Plated (2 Meter)


Price: ₹ 599.00 - ₹ 199.00
(as of Jun 11,2021 10:30:00 UTC – Details)



INTRODUCTION
Do you want to play your PS3/PS4, Xbox 360,Blu-ray player, Laptop, Satellite disc, or other HDMI enabled device on your big-screen HD TV or PC monitor ? Then this enreta HDMI cable is the answer.

High Speed Function
enreta HDMI gold plated v1.4a cable accommodates high speed data intensive bandwidth required for 1080p video resolution and color depth of 48 bit.
Transfers Digital Audio and Video signals at fast speed of 10.2 Gigabits per second

Compatibility
HDTV, LCD, Plasma TV , LED TV, 3D TV, Apple TV, Home Theatres, Home Cinema, Sky HD, Free sat, Virgin HD, Dream Box, Set top Box, PS3, PS4Xbox 360, Nintendo Wii U, HD DVD player, Blu Ray, Projector, Digital cameras and camcorders, Laptop, PC, Sony, and many more. In short all HD ready devices and gadgets Resolutions 480p, 720p, 1080i,1080p and 2160p Manufactures such as Sony, Samsung, Apple, Phillips, Sharp, LG, Mitsubishi and many more
Supports True HD Dolby 7.1 and DTS-HD Master Audio
Supports 3D TVs Functions – Best for 3D gaming and 3D home cinemas

Features
Latest version 1.4 for higher speeds and Deeper color
Built-in Ethernet capabilities
Built-in Audio Return
Oxygen Free Copper conductor
24K Gold Plated corrosion-resistant connectors to ensure superior signal transfer and maximum performance
Maximum reliability by triple shielding (2*foil and 1* Tinned Copper Braid Shielding)
Triple Shielding to provide complete immunity to environmental EMI and RFI

Important
Twisting, tugging on or stapling HDMI cable could cause the cable to malfunction, so use caution when you work with it.

Pack Includes
1 x High-Speed HDMI Cable

Transfer both audio and video through one REALMAX HDMI cable
Compatible with : HDTV, LCD, Plasma TV, LED TV, 3D TV, Apple TV, Home Theatres, Home Cinema, Sky HD, Freest, Virgin HD, Dream Box, PS3, PS4, Xbox 360 One, Nintendo Wii U, HD DVD player, Blu Ray, Projector, Digital cameras and camcorders, Laptop, PC and many more. In short all HD ready devices and gadgets
Supports all manufactures such as Sony, Samsung, Apple, Phillips, Sharp, LG, Mitsubishi and many more
Larger gauge PVC jacket provides maximum shielding against wear and tear and extreme temperatures


1080p Full HD tv

Leave a Reply

Your email address will not be published. Required fields are marked *